How Are Granny Flats At Money Spaces Made?
2024-07-15
- #Products
- #Process
Are you thinking about how to build your granny flat, but finding it hard to decide which construction method to choose? We understand that this is a big decision, and we're here to help you make it easy.
If you're looking for an alternative to traditional construction methods due to their complexities and challenges, then Money Spaces' granny flats might just be the perfect answer for you. They offer a range of benefits that could perfectly suit your needs.
At Money Spaces, our granny flats are primarily built in a manufacturing facility and are constructed in sections to around 90-95% completion off-site. These products are then transported and assembled on the building site. Once installed on the foundations and connected to the services, granny flats are ready for use.
In this article, we'll walk you through how Money Spaces' granny flats are built and provide you with the knowledge and confidence to navigate this construction approach with ease and certainty.
The granny flat building process
After the design and paperwork are complete, the granny flats building process begins. This is usually divided into the following key stages:
1. The frame stage
The first step of granny flat construction is to build the house frame. Most granny flat companies use steel for the base frame as it is strong, reliable, and able to withstand transport on a truck. During the framing stage, the carpenters will install the particle board flooring, build the timber wall and roof structure, and brace the frame. When this work is complete, a Building Surveyor will inspect the frame.
A key benefit to building homes in a factory environment is that it significantly reduces waste and the environmental impact on site. This is facilitated by the ability to store excess materials for future use, rather than disposing of them. Furthermore, the trades constructing the homes primarily work within the factory environment until the home is transported to the site, minimising disturbances and the environmental impact on-site.
2. The lock-up stage
The next step is to add all the exterior features onto the prefabricated frame so that it is a weather tight and secure home. This includes the roofing, guttering, external cladding, windows, doors, and decking. During this stage, the electrical and plumbing contractors will also run their wiring.
Since this stage takes place in a controlled environment, the contractors can work quickly and without delay. It also allows for smoother workflows and more refined collaboration between different subcontractors.
3. The fixing stage
During the fixing stage, all the surfaces and fixtures are added, such as carpentry, cabinet making, plastering, tiling, plumbing, and electrical. The last step of the fixing stage is to install the flooring, at which point, the home is ready for delivery.
4. Site preparation
Before the granny flat is scheduled for delivery, all the site preparation needs to be completed, including excavation, foundations, and retaining walls. This way, your site will be ready for installation on delivery day. One of the key benefits of modular construction is that you can complete this step at the same time as the factory construction phase, resulting in faster timelines so you can move into your new home sooner.
5. Delivery and installation
When the house and building site are ready, the house will be loaded onto a truck and delivered to its location. Once it arrives, the flats are reassembled and made into one cohesive unit. At Money Spaces, this process takes as little as one to three days, depending on your location and the size of your project.
The remaining site work can then be completed, including any of the following finishing touches:
- Plastering.
- Painting.
- Sub-floor cladding.
- Commission of the electrical and plumbing infrastructure.
- Stairs and balustrade.
- Connection to site services.
- Construction of the garage or carport (if included).
At this point, the Building Surveyor will complete a final inspection before issuing a Certificate of Occupancy.
Build Granny Flat with Money Spaces
At Money Spaces, we pride ourselves on designing and building reliable, high-quality granny flats. We also know the value of a seamless building experience and always strive to provide you with exceptional customer service.
When building a home with us, you’ll gain access to our experienced team of designers, builders, and project consultants who will help bring your vision to life.
To simplify the process for you, we’ve broken it down into the following 10 steps:
- Complimentary consultation
- Project proposal
- Design and site engineering
- Council permits
- Specification selection and documentation
- Contract
- Building permit
- Construction
- Delivery and site work
- Handover
At Money Spaces, we stand ready to guide you through every phase of your granny flat project, offering expertise, reliability, and exceptional customer service. Whether you're considering a pre-designed home, minor customizations, or a completely custom design, our experienced team is dedicated to bringing your vision to life.
If you’re keen to kickstart your new granny flat project, we’d love to help. Talk to our expert team or book a time to visit our display homes and take the first step towards making your dream home happen!